Completion Date:
Duration:
Location:
Core Services:
Network:
Services:
Brands Used:
2 Weeks
Kampala
IT Fit Out,
CAT6A/7
Data
Molex
Project Desciption
CF remit was to completely rewire and rebuild Orange’s data section (14 Racks) within its main data centre that controls the telecoms and data backbone, call centres as well as the 3G network
Downtime had to be kept to a minimum and only within very strict and narrow bands of time as this infrastructure was supporting a nation 3G network as well as being a major data provider.
This involved the complete creation of rack interconnecting backbone as well as the complete reorganization of the copper/fibre and power infrastructure contained within these racks.